On November 30th, Craig McCoy spent the day filling in the electrical ditch and spreading gravel around the site. We now have electricity ou=t to the site, and gravel walkways all around. The deck and ramp are almost finished, and Craig put gravel right up to the shed, so we don't need any stairs.
We still need to figure out what lighting fixtures we want for the outside and inside of the yurt, and we will need to complete the electrical wiring to the yurt. We are also researching floor options since we now just have a plywood floor.
We are hoping to have everything finished and ready for occupancy by the spring.
Thanks to the many volunteers, and our contractor, Mac Smith, for all of the work to get us to this point. We are excited about all of the possible uses in the coming years.